Synthetic Stones Wholesale: First-Order Landed Cost Math
— the notes below follow the order we actually quote, sample and ship these pieces.
Why the unit price on the quote is not your cost
Every week a buyer sends me a screenshot of a quote and asks whether it is a good price. My answer is always the same: that number is not your cost. It is the ex-works price of one component, and it tells you nothing about what lands in your warehouse.
I have spent twelve years on the QC bench and the shipping dock, and the pattern is boringly consistent. Buyers who compare only the per-carat or per-piece figure get surprised at the border. Buyers who build a landed cost sheet before they order usually get within 5% of the final invoice. This piece is the second sheet, the one you actually need.
One note before the math. We run our own cutting and setting floor, so our cost and turnaround typically come out around 20% better than a trading company quoting the same spec. The reason is simple: no middle layer marking up the stone, and no second factory adding a week of queue time. That gap shows up in every line below.
The five lines that make up your landed cost
Forget the single number. A first order has five cost lines, and four of them are invisible on the supplier's quote.
- Product cost: the stone or finished piece, ex-works, at your confirmed grade
- Certificate cost: per-item grading documents, priced per piece not per order
- Payment cost: deposit wiring fees, and PayPal fees if you sample first
- Freight and insurance: DDP is usually cleanest for a first shipment
- Duty and import VAT: charged on the declared value plus freight, by destination
The trap is that lines two and three scale with quantity while line four scales with weight and volume. A 200-piece order of small melee has a completely different freight profile than 30 pendant-size stones in gift boxes.
A worked example: 100 pieces, mixed sizes, US destination
Here is a realistic first order for a US buyer testing the category. Round brilliant moissanite, 1.0 to 2.0 carat equivalent, loose stones, D-E-F color, VVS, with individual certificates. Numbers are illustrative, but the ratios are what I see daily.
| Cost line | Basis | Typical amount | Share of landed |
|---|---|---|---|
| Stones, ex-works | 100 pcs, mixed sizes | 1,850 | 76% |
| Certificates | Per piece, GRA plus IGI on larger stones | 210 | 9% |
| Payment fees | T/T 30% deposit, balance before ship | 55 | 2% |
| DDP freight | 5-8 days door to door, insured | 180 | 7% |
| Duty and VAT | Included under DDP terms | 145 | 6% |
Landed total sits near 2,440 for 100 pieces, so roughly 24.40 per piece against an ex-works average of 18.50. That is a 32% uplift, and it is normal. Anyone quoting you a landed cost within 5% of ex-works is either eating freight or not telling you about duty.
Now run the same sheet at 30 pieces and the percentages move hard. Certificates and freight barely drop, so landed cost per piece can climb 40 to 50% above the small-order ex-works figure. This is the single most common first-order mistake I see.
Where the money actually leaks
Certificate scope creep
GRA cards are cheap and expected. IGI reports cost real money per stone and only make sense above a certain size or value. If you certificate a 0.5 carat melee stone with a full lab report, you have spent more on paper than on product. Match the document to the stone.
Grade drift between sample and bulk
A sample stone is hand-picked. Bulk is not. If your purchase order does not state color and clarity range in writing, you will receive the bottom of the range and your re-order math collapses. Our incoming stone check exists exactly for this: every parcel is graded on arrival before it touches a setting bench.
Freight assumptions
Buyers often budget air freight on weight alone and forget volumetric weight and insurance. Gift boxes and velvet pouches add volume fast. DDP at 5-8 days door to door removes the guesswork, because the freight and duty figure is fixed before you pay.
How to structure the first order so the math works
MOQ is 1 piece for stock items and 30 pieces for custom work. That is deliberate: it lets you test a shape or a grade without committing to a container. Production runs 12-18 days, and every order passes three QC stages, incoming stone check, in-process inspection during setting, and a pre-ship AQL sample pull.
Payment is T/T with 30% deposit and balance before shipment. For a first sample or a small trial, PayPal is fine and worth the fee for the protection. Wire the bulk order once you have seen the goods.
Rule of thumb from the floor: if the landed cost sheet is not done before the deposit goes out, the buyer is not buying, they are gambling.
A practical structure for order one: 60% of budget on core sizes you can re-sell quickly, 25% on two or three fashion shapes, 15% held back for a re-order of whatever sold. That last slice matters, because a fast re-order is where you make your margin, and 12-18 days beats a six-week import cycle every time.
What to put in the RFQ so the numbers come back clean
- Stone type, shape, size range in millimeters, not just carat
- Color and clarity range stated as a band, with an acceptance rule
- Certificate type per size tier, and who pays
- Packaging spec, since it drives freight volume
- Incoterm, destination city, and whether you want DDP
- Target ship date and whether partial shipment is acceptable
Send that and any competent factory can return a landed figure in one pass. Send a one-line message and you will get a one-line price, which is exactly the number that misleads you later.
Frequently Asked Questions
What is the minimum order for a first synthetic stones wholesale order?
Stock items ship from 1 piece, so a genuine trial order is possible. Custom cuts, custom settings and mixed grade runs start at 30 pieces. Price is quoted per piece ex-works, with certificates and freight itemized separately so you can see the landed total.
How long does production and delivery take?
Production is 12-18 days after deposit and artwork or spec approval, depending on whether stones are stock or custom. DDP delivery then runs 5-8 days door to door. Certificates add one to three days if IGI reports are in scope.
How is price calculated, and why does my landed cost differ from the quote?
Quotes are ex-works per piece at your confirmed grade. Landed cost adds certificates, payment fees, insured freight and duty, which together typically lift the total 25 to 35% on a 100-piece order and more on small orders. We provide the itemized landed sheet with every quote so there is no surprise at the border.
If you want a landed cost sheet built around your actual sizes, grades and destination, send the spec to service@holycome.com or message WhatsApp +86 133 7744 7107. Samples from stock can go out the same week, and we will show the full breakdown line by line before you commit to anything.
Every figure here is quoted from our own bench in Wuzhou.
Send a spec sheet
