Wholesale Moissanite: Payment Terms, Deposit & Balance
— the notes below follow the order we actually quote, sample and ship these pieces.
Understanding Payment Terms and Deposits for Wholesale Moissanite Orders
Wholesale moissanite orders from our factory run on a straightforward structure: a 30 percent T/T deposit to start production, with the remaining 70 percent balance due before shipment. Sample orders can be paid through PayPal, which gives new buyers a lower-risk way to test quality before committing to bulk quantities.
This article walks through every payment decision a wholesale buyer faces, from the first sample invoice to the final balance on a DDP shipment arriving in the US, so you can plan cash flow and place orders with confidence.
Why the Deposit Structure Works the Way It Does
The 30 percent deposit is not an arbitrary number. When you confirm a bulk moissanite order, we begin purchasing loose stones by the carat and allocating metal inventory for your specific production run. The deposit covers that material commitment, which is why production cannot start until it clears. For you as a buyer, this structure has a real benefit: the majority of your cash stays on hand until the goods are finished, inspected, and ready to ship.
T/T wire transfer is the standard method for bulk orders. PayPal is accepted for sample orders because sample invoices are small and buyers often prefer the familiar checkout process and dispute handling on a first transaction. Once a working relationship is established, most buyers move everything to T/T for simplicity and lower processing friction on their side.
Planning Cash Flow Around Production Timelines
Timing matters as much as the amount. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after you approve the sample. That means the 70 percent balance is due roughly three to five weeks after your deposit, not immediately. Buyers who map their inventory launches against this window avoid scrambling for funds mid-cycle.
A practical approach is to set the sample approval date as your anchor, then count forward to the expected balance due date and the 5 to 8 day DDP transit time to your US warehouse or fulfillment center.
Choosing Between Stock Styles and Custom Work
Order type changes the conversation around deposits. Stock styles carry a 1 piece minimum, so you can order a single unit to evaluate a design before scaling. Custom work carries a 30 piece minimum, because tooling, stone setting setups, and production planning only make sense at that volume. The deposit terms are the same in both cases, but custom work involves decisions that get locked in after sample approval: stone grade, metal type, plating thickness, and sizing.
Settle every detail at the sample stage, because changes after bulk production starts can add cost once stones and labor are already committed.
Comparing Payment Methods for Different Order Stages
Each stage of a buying relationship has a natural payment method. During sampling, PayPal keeps things quick and low-commitment. For bulk production, T/T is the norm, and your bank will need standard wire details from our sales team. Some buyers split the difference by paying for samples with PayPal and then establishing a documented T/T routine for repeat bulk orders.
Whichever path you choose, keep records of every transfer reference, since those references are how we match incoming funds to your production order and trigger the start of work.
Matching Terms to Order Types: A Quick Reference
Different order types call for different payment approaches and pricing bases. The table below summarizes how terms align with the way each category is quoted and fulfilled, so you can brief your finance team before the first transfer.
| Order Type | Minimum | Pricing Basis | Payment Method | Production Time |
|---|---|---|---|---|
| Stock styles | 1 piece | Per piece | T/T or PayPal | 7 to 25 days |
| Custom work | 30 pieces | Per piece | T/T | 15 to 25 days |
| Loose stones | By carat | Per carat | T/T | Varies by stock |
| Samples | 1 piece | Per piece | PayPal | 7 to 10 days |
Note that loose moissanite stones are priced per carat while finished pieces are priced per piece. If you buy stones and setting services separately, expect two invoices and two payment cycles, so plan your deposit timing accordingly. Buyers who consolidate into finished-piece orders often prefer the single invoice and single deposit that come with a standard production run.
Managing the 70 Percent Balance Before Shipment
The balance is due before goods leave the factory, not on delivery. This is standard for direct-from-manufacturer orders and it connects directly to our quality control process. Every moissanite order passes three inspection stages: incoming material checks, in-process checks during production, and a pre-shipment AQL inspection. You pay the final 70 percent only after that pre-ship inspection is complete, which means you can request inspection reports or photos before wiring the balance.
Verifying Quality Before Releasing Funds
For graded stones, ask for the accompanying paperwork. Our moissanite is certified with GRA or IGI papers depending on the stone, and those documents travel with the goods. Reviewing certification before paying the balance gives you a documented link between the stones you ordered and the stones being packed. For finished jewelry, request photos of the pre-ship sample pull, including close-ups of prongs, plating finish, and stone setting.
A short review at this stage protects both sides and prevents disputes after goods are in transit.
Coordinating Balance Payment With DDP Shipping
We ship DDP to the US, which means duties and delivery to your door are handled by us, with transit taking 5 to 8 days. Because the balance is due before shipment, the practical sequence is: pre-ship inspection completed, balance wired, shipment booked, tracking issued, and goods arriving within the 5 to 8 day window.
Buyers running seasonal launches should build those transit days into their calendar, since the balance payment and shipping arrangement happen in sequence rather than in parallel.
What the Deposit Does and Does Not Cover
Clarity here prevents misunderstandings. The 30 percent deposit commits materials and production capacity for your order. It is not a separate fee, and it is credited against the total invoice value. What it does not do is lock specifications that were never agreed in writing. If you change stone size, metal type, or design details after sample approval, the quote is revisited, and any difference is settled against the balance.
Keeping your approved sample reference on file with our sales team makes these conversations fast and factual.
Practical Budgeting Tips for First-Time Buyers
Buyers placing a first moissanite order often ask how to structure spend across the sample and bulk stages. A disciplined approach looks like this: start with one or two stock styles at the 1 piece minimum to evaluate finish and stone quality, pay those samples through PayPal, then use the results to decide on a custom run at the 30 piece minimum or a larger stock replenishment.
Because pricing is quoted per piece or per carat depending on the item, ask for a breakdown that separates stone cost from setting cost. That breakdown makes it easier to compare designs on an apples-to-apples basis and to see how stone carat weight drives the final per-piece price.
Another tip: align your deposit timing with stone selection. If your order uses specific graded stones with GRA or IGI papers, stone allocation happens when the deposit clears. Buyers who have their stone grade and carat decisions finalized before sending the deposit move through production faster, because there is no pause mid-run waiting on a specification decision. Anything you can settle during the 7 to 10 day sampling window is time saved during bulk production.
Handling Repeat Orders and Standing Arrangements
Once your first cycle is complete, repeat orders follow the same terms, but the rhythm becomes familiar. Many buyers set an internal rule: reorder when stock reaches a defined level, send the deposit the same week, and expect goods 20 to 33 days later accounting for production and DDP transit.
Because terms do not change between a first order and a tenth order, finance teams can set up a repeatable approval workflow: sample approval triggers deposit approval, and pre-ship inspection reports trigger balance approval. Treat the terms as fixed infrastructure and the relationship runs with minimal back-and-forth.
Questions to Ask Before Sending Your First Deposit
A short checklist keeps the first transaction clean. Confirm the pricing basis for every line item, whether per piece or per carat. Confirm the minimum that applies, whether 1 piece for stock or 30 pieces for custom. Confirm which payment method applies at your current stage. Confirm the expected sample and production timelines in writing. Finally, confirm the DDP arrangement so duties and US delivery are understood before the balance is due.
Ten minutes of clarification at this point removes nearly every source of friction later in the cycle.
Order Terms for Wholesale Buyers
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
Frequently Asked Questions
Can I pay the full amount upfront instead of a deposit?
Yes, some buyers prefer a single payment to simplify accounting. The standard structure is 30 percent deposit and 70 percent balance before shipment, but a full upfront payment by T/T is accepted and simply removes the second transfer step. Either way, the pre-ship AQL inspection still happens before goods leave the factory.
Why is PayPal only for sample orders?
PayPal suits the small invoice amounts typical of sampling, where you are ordering one or a few pieces at the 1 piece stock minimum. Bulk production invoices are larger, and T/T wire is the standard method for those. If you are unsure which applies to your order, our sales team will confirm the method when quoting.
When exactly is the 70 percent balance due?
The balance is due before shipment, after the pre-ship inspection stage is complete. In practice this lands around three to five weeks after your deposit, once sampling and the 15 to 25 day production run are finished. We will confirm the amount and provide transfer details at that point.
Do loose stones follow the same deposit terms?
Loose moissanite is sold by the carat and priced per carat, and bulk stone orders follow the same T/T deposit and balance structure. Because stone inventory moves quickly, confirming your carat weight and grade requirements early helps us allocate material against your order without delays.
What paperwork comes with a certified moissanite order?
Graded stones ship with GRA or IGI papers, depending on the stone. Those documents accompany the goods through DDP delivery to the US, arriving within 5 to 8 days of shipment. Keep the papers with your inventory records, since they support resale and customer questions about the stones.
Ready to Place Your First Moissanite Order?
The payment structure is designed to keep your risk low at the start and your cash flexible through production. Begin with a sample paid through PayPal, approve the piece, then send the 30 percent T/T deposit to start a bulk run with clear timelines and a pre-ship inspection before the balance is due. To review stone grades, order minimums, and shipping details, visit our knowledge base for wholesale buyers.
To learn how our factory operates and who you will be working with, read about our company and manufacturing process. And when you are ready to develop your own designs at the 30 piece custom minimum, explore our custom moissanite jewelry services to start the conversation.
Moissanite is a lab-created diamond alternative, not a natural diamond; listings and customer-facing copy should describe it that way.
Sources: Grading references: GIA gem education and GIA laboratory information.
Every figure here is quoted from our own bench in Wuzhou.
Send a spec sheet
