Guides B2B: Where the USD 38-210 Per Piece Goes
Buying & Wholesale — the notes below follow the order we actually quote, sample and ship these pieces.
The Short Answer on Price
Short answer: the USD 38-210 band is not a discount level, it is a specification level. Change the metal thickness, the stone grade or the plating micron and the band moves before anyone discusses margin. The breakdown below shows the five lines, which of them a factory can compress, and which of them only look compressible, and that is the number guides buyers at USD 38-210 compare first.
Cost Split on a guide
Five lines, one hundred percent. Read the share column against the line that moves it, then ask which of those the factory actually controls. Metal and stone are market-priced; labor and finishing are controlled on the bench, and on guides at USD 38-210 this is the line that moves the margin.
| Cost line | Share of piece | What moves it | Who controls it |
|---|---|---|---|
| Metal for the guide | 32% | Alloy choice, shank thickness and casting yield | Factory |
| Stone and melee in guides | 25% | Sieve range, grade band and lot batching | Market plus grade |
| Bench labor per piece | 19% | Setting type, prong count and jig design | Factory |
| Finishing and plating | 14% | Plating micron, polish passes and pre-plate inspection | Factory |
| Packing and the poly bag and hangtag | 10% | Pouch, box, print run and carton count | Buyer choice |
The shares above are for a mid-band specification. Push the plating to 3 microns, or move from melee to a certified center, and the finishing and stone lines both rise while metal stays flat, with IGI and the poly bag and hangtag on the same sheet as guides.
Line by Line
Where the metal line sits
Metal is the least negotiable line in a guides quote, because it is bought by weight and priced by weight. What a factory controls is thickness and yield: a shank 0.2 mm thinner saves a few percent of metal and costs a resizing later, and a casting yield two points better saves more than any discount conversation. Ask for the gram weight per piece at the quoted size, not for a percentage off.
Where the stone line sits
The stone line is where two quotes for the same drawing diverge by double digits, and almost never because one factory is cheaper. It diverges because one is quoting a grade band and the other is quoting a grade. Ask for the band in writing: color range, clarity range, mm tolerance. A guide at USD 38-210 with a wide band and one at the same price with a narrow band are not the same product.
Where the labor line sits
Bench minutes decide the labor share, and the setting type decides the minutes. A prong setting and a bezel on the same guide can differ by several minutes per piece, which at 100 pieces is the difference between one quote and another. Ask for minutes per piece and for the jig that holds the repeat, because a jig is what makes a reorder cost less than the first run.
Where the finishing line sits
Finishing is the cheapest line to specify and the most expensive to skip. Rhodium at 0.20 micron with a palladium strike reads white through a season; nominal plating reads white at the counter and yellow at the third month. Pre-plate inspection of casting porosity belongs here too, because plating a porous surface is a six-week delay on a complaint rather than a fix, and on guides that is the difference between a reorder and a credit note.
Where the packing and freight line sits
Packing is a buyer choice, so it should be quoted separately from the piece. The poly bag and hangtag carries a print run, a carton count and a packing list, and all three are priced per order rather than per piece. Freight is the one line that is not a cost of the guide at all, which is why landed cost belongs on a second sheet.
Prices by Quantity Band
| Quantity band | Unit price | What changes |
|---|---|---|
| 50 to 200 pieces | USD 38-210 | Setup amortised over a small run; gauge and sample already paid |
| 200 to 500 pieces | USD 34-193 | Jig and fixture amortised; stone bought in a matched lot |
| 500 pieces and above | USD 32-178 | Dedicated stone procurement and a reserved production slot |
The ladder is arithmetic, not a volume trick. The setup, the gauge and the sample are fixed costs; the metal and stone are not. Splitting them explains why the third band moves less than the second, and on guides that is the difference between a reorder and a credit note.
A buyer comparing a 50-piece quote with a 500-piece quote is comparing two different products. Compare bands, then decide which band your first two orders actually sit in, because that is the number your margin has to survive, and that is the number guides buyers at USD 38-210 compare first.
We quote the band before the design is finalised so the buyer can size the first order to the band rather than discover the mismatch after sampling, and on guides at USD 38-210 this is the line that moves the margin.
The Lines Missing From a Guides Quote
- Return freight on a rejected tray, which is charged by the courier and not by the factory, and is the line buyers forget when they compare two quotes.
- Re-plating or re-polish after a season, when nominal plating wears through on a fast-moving SKU and the piece comes back through the counter rather than the factory.
- Reship on a sizing drift, because a run that drifts 0.3 mm across sizes produces a second shipment for the same order.
- The certificate you did not ask for at the quote stage, priced at the moment a marketplace or a customs broker asks for it, which is always the expensive moment.
- The air freight to protect a launch date, charged at four to six times the ocean rate, and usually caused by a sample approved two weeks later than the calendar allowed.
Ask each supplier which of the five appears on their invoice history most often. The answer is a better guide to their real price than the quote sheet, and that is the number guides buyers at USD 38-210 compare first.
Landed Cost and the Multiple You Need
| Line | Amount per piece | Note |
|---|---|---|
| Factory price per piece | USD 38-210 | Ex-works, packing included, certificate per the quote |
| Freight and duty allocation | USD 3-16 | Ocean at 100 pieces; DDP quoted separately |
| Landed cost | USD 41-226 | The number your retail multiple has to clear |
| Retail at 3.0x | USD 123-678 | Typical for a boutique with a 55 to 60 percent margin |
A three-times multiple on landed cost is the working assumption for a US boutique; below 2.6 the guide has to carry the marketing itself. That is why the factory band matters more than the discount.
The multiple is not a pricing opinion, it is a cash constraint. Pieces that sit for two seasons need a higher multiple to pay for the floor space, and pieces that reorder need a lower one, with IGI and the poly bag and hangtag on the same sheet as guides.
Run the arithmetic on the band you will actually order, not on the 500-piece band you hope to reach. The first two orders are what the cash flow has to survive, and on guides that is the difference between a reorder and a credit note.
Frequently Asked Questions
What is included in the USD 38-210 band for guides?
Piece, packing per the poly bag and hangtag, and IGI on the lots above the threshold. Freight, duty, certificate upgrades and private-label print runs are quoted separately so the band stays comparable, and that is the number guides buyers at USD 38-210 compare first.
Why do two suppliers quote the same design so differently?
Almost always the stone grade band or the bench minutes. Ask for the band in writing and for minutes per piece; a difference under ten percent is specification, above twenty is a different product, and on guides at USD 38-210 this is the line that moves the margin.
Can the metal line be reduced without losing quality?
Yes, by 0.2 mm of shank thickness or by a lighter hollow section, at the cost of resize work later. We quote both and state the trade rather than choosing it for the buyer, with IGI and the poly bag and hangtag on the same sheet as guides.
How much does plating thickness change the price?
Vermeil at 3 microns costs more than rhodium at 0.20 micron, and both cost less than the re-plating a nominal finish triggers. The delta is per lot, not per piece, so small runs see it as a setup line, and on guides that is the difference between a reorder and a credit note.
Do you quote landed cost?
Yes, as a separate line with the duty assumption stated. DDP is available for US accounts and removes the invoice that otherwise arrives after the carton clears, and that is the number guides buyers at USD 38-210 compare first.
Next Step
Send the specification and the quantity band, and the reply breaks the price into the five cost lines with the share of each, so the number can be argued line by line instead of as a whole, and on guides at USD 38-210 this is the line that moves the margin.
Wuzhou HengliLai Jewelry Co., Ltd. has made guides under the HOLYCOME label since 2009, at a plant in Wuzhou, Guangxi, running roughly 60,000 pieces monthly. Because casting and setting sit in the same building, a gauge change on the bench reaches the next tray the same week rather than the next shipment. Quotes, drawings and inspection sheets go out from service@holycome.com, or WhatsApp +86 133 7744 7107.
Related reading: Guides B2B Buying Decision: Which Route to Stock First - HOLYCOME Care & Materials Distributor Tier: AQL, Tray Checks and What a QC Report Should Say - HOLYCOME
MOQ starts at 1 piece, and how that works in practice
MOQ starts at 1 piece, and that is not a marketing line, it is how the sampling lane is run. A single piece moves through the bench as a sample, which is the only honest way to approve a spec before a batch is committed.
That said, one piece is a sample, not a production run. At one piece the per-unit cost carries the setup, so the price you see is a sample price, and it is quoted as such rather than dressed up as a volume rate.
Volume pricing starts where the setup stops dominating: small runs of ten to twenty pieces per style open a real per-unit step, and the step improves again once a style is running in the hundreds.
So the practical answer is: sample at MOQ 1, approve the spec, then buy the batch at the volume step that matches your shelf space. Buying one piece repeatedly is expensive; committing before you sample is riskier.
Where the per-piece cost actually goes
The number you see in the quote is not the metal value plus a margin. It is built from six lines, and knowing which line moves is how a buyer negotiates without guessing.
Metal weight is first and it follows the band width, not the style name. Plating thickness is second, and it is the line most often quietly reduced between a sample and a reorder.
Then come the stone cost at the stated millimeter, the setting labor per stone, the finishing and polishing time, and the packing and paperwork. Labor and finishing are the lines that scale down with volume; metal never does.
That is why a supplier who offers a big discount on a small order is usually cutting the plating or the stone grade rather than the labor. Ask which line moved, and the answer tells you whether the quote is real.
Every figure here is quoted from our own bench in Wuzhou.
Send a spec sheet